Scheme of the plant
Scheme of the plant
| 1. Single-storey piping shop with a metal frame |
|---|
| Piping works |
| Repair of ship fittings |
| Repair of heat exchangers of main engines and diesel generators |
| Repair of steam and water heating boilers |
| Associated works |
| 2. PRU workshop - Repair section for Propeller-Rudder Unit |
| Repair of propeller shafts |
| Repair of propellers |
| Repair of steering gear |
| Shaft lines and main engines alignment |
| Repair and production of shaft line bearings with a set of rubber segments |
| Replacement and repair of stern tubes |
| 3. MRW (maintenance and repair workshop) - Universal process section |
| Repair of ship pumps, boilers and units |
| Repair of anchor and mooring equipment |
| Repair and manufacturing of locking devices |
| Replacement of fabricated rubber products |
| Associated works |
| 4. HWB shop |
| Hull welding section |
| Hull welding works |
| Gas cutting works |
| Fabrication and installation of steelworks |
| Jointwork |
| Replacement of wooden fender guard |
| Replacement of wooden floorings |
| Associated works |
| 5. SLIP |
| Docking |
| Cleaning and painting works |
| Work with the anchor chain |
| Rigging works |
| Associated works |
